All use cases
- energy-utilities
- Maintenance & Reliability
- representative
Commissioning Inspection and Warranty Evidence for a New Solar Build
An EPC contractor completing a large utility-scale build must document module condition at handover to protect against later warranty disputes.
Runs onWayam EyeHow the work runs
The pressure that made this worth automating, the steps the system runs, and what came out the other side.
Pressure & Trigger Points
- Manual commissioning inspection samples a fraction of modules, leaving warranty exposure on the rest.
- Defects present at handover are hard to distinguish later from defects caused by operation.
- Warranty claims fail without dated, located evidence of condition at handover.
The run · 5 operational steps
Click any step to inspect telemetry signals, model reasoning, and governance gates.
scroll →
1
Full-Site Baseline Capture
Every module is imaged at handover rather than a sampled subset.
Input Signal:
Real-time operational telemetry & queue
Reasoning Pattern:
MCP grounded vector inference
Governance Gate:
Policy constrained with audit write-back
Verified Business Outcomes
- Complete rather than sampled condition evidence at handover.
- Manufacturing defects separable from operational damage later.
- A dated baseline that every subsequent inspection is measured against.
Capabilities this relies on
- vision perception
- anomaly detection
- risk scoring
- alert routing
- system connectors
More in Wayam Eye