Skip to content
All use cases
  • energy-utilities
  • Maintenance & Reliability
  • representative

Commissioning Inspection and Warranty Evidence for a New Solar Build

An EPC contractor completing a large utility-scale build must document module condition at handover to protect against later warranty disputes.

Runs onWayam Eye

How the work runs

The pressure that made this worth automating, the steps the system runs, and what came out the other side.

Pressure & Trigger Points

  • Manual commissioning inspection samples a fraction of modules, leaving warranty exposure on the rest.
  • Defects present at handover are hard to distinguish later from defects caused by operation.
  • Warranty claims fail without dated, located evidence of condition at handover.

The run · 5 operational steps

Click any step to inspect telemetry signals, model reasoning, and governance gates.

scroll →

1

Full-Site Baseline Capture

Every module is imaged at handover rather than a sampled subset.

Input Signal:

Real-time operational telemetry & queue

Reasoning Pattern:

MCP grounded vector inference

Governance Gate:

Policy constrained with audit write-back

Verified Business Outcomes

  • Complete rather than sampled condition evidence at handover.
  • Manufacturing defects separable from operational damage later.
  • A dated baseline that every subsequent inspection is measured against.

Capabilities this relies on

  • vision perception
  • anomaly detection
  • risk scoring
  • alert routing
  • system connectors

More in Wayam Eye