Skip to content
All use cases
  • manufacturing
  • Quality & Compliance
  • representative

Root-Cause Isolation via Bidirectional Traceability in Industrial Automation

A manufacturer of industrial Variable Frequency Drives (VFDs) and power control modules produces high-voltage power conversion units for water treatment facilities and automated factory floors. Each drive undergoes rigorous end-of-line electrical testing before field installation.

Runs onAnvaya
investigation time from field failure report to root-cause
5 daysinvestigation time from field failure report to root-cause
manufacturer submits an indisputable, data-backed warranty
100%manufacturer submits an indisputable, data-backed warranty

How the work runs

The pressure that made this worth automating, the steps the system runs, and what came out the other side.

Pressure & Trigger Points

  • A field failure is reported for an installed VFD (Serial # VFD-9021-X) that suffered a thermal power stage breakdown after 100 hours of operation.
  • Quality engineers must quickly determine whether the failure was caused by shop-floor assembly error, incorrect test parameters, or a defective vendor component lot.
  • Legacy traceability is strictly unidirectional; finding whether other active WIP jobs contain components from the same suspect batch requires opening hundreds of physical job jackets.

The run · 5 operational steps

Click any step to inspect telemetry signals, model reasoning, and governance gates.

scroll →

1

Backward Serial Traceability

Quality engineers input Serial # VFD-9021-X into Anvaya Bidirectional Traceability. The system instantly traces backward from the failed unit to identify the exact power MOSFET lot (Lot # MOSFET-441-A) used during assembly.

Input Signal:

Real-time operational telemetry & queue

Reasoning Pattern:

MCP grounded vector inference

Governance Gate:

Policy constrained with audit write-back

Verified Business Outcomes

  • Investigation time from field failure report to root-cause isolation drops from 5 days to 20 minutes.
  • 48 defective VFD units currently in production are intercepted and reworked before shipping to customer sites.
  • The manufacturer submits an indisputable, data-backed warranty claim to the semiconductor vendor, recovering 100% of material rework costs.

Capabilities this relies on

  • system connectors
  • signal ingestion
  • root cause reasoning
  • anomaly detection
  • workflow orchestration
  • evidence audit trail

Related catalog agents

More in Anvaya