Setup Grouping & Changeover Minimization in Contract Electronics
A high-mix Contract Electronics Manufacturer (CEM) operating 12 Surface Mount Technology (SMT) lines producing PCBA boards for automotive and industrial IoT clients.
Runs onNiyojan- machine changeover setup downtime reduced
- 58%machine changeover setup downtime reduced
- SMT line Overall Equipment Effectiveness (OEE) increased
- 52%SMT line Overall Equipment Effectiveness (OEE) increased
How the work runs
The pressure that made this worth automating, the steps the system runs, and what came out the other side.
Pressure & Trigger Points
- Frequent order changeovers between custom customer PCBA jobs consumed 35% of total line operating hours in setup downtime (re-reeling component feeders, changing solder stencils).
- Planners scheduled orders strictly by customer priority date, causing excessive machine changeovers between jobs sharing identical component reels.
- SMT machine line efficiency (OEE) dropped to 52% due to setup downtime.
The run · 5 operational steps
Click any step to inspect telemetry signals, model reasoning, and governance gates.
scroll →
BOM Component Similarity Grouping
Niyojan analyzes active work order BOMs, automatically identifying jobs that share high percentages of identical SMT component reels.
Real-time operational telemetry & queue
MCP grounded vector inference
Policy constrained with audit write-back
Verified Business Outcomes
- Machine changeover setup downtime reduced by 58%, unlocking 14 hours of hidden line capacity weekly per SMT line.
- SMT line Overall Equipment Effectiveness (OEE) increased from 52% to 74%.
- Increased plant throughput by 22% without purchasing additional capital machinery.
Capabilities this relies on
- constraint solving
- system connectors
- forecasting
- scenario simulation
- workflow orchestration
Related catalog agents
- AGT-0157
Production Schedule Optimization Agent
Manufacturing Operations
- AGT-0201
Computer Vision Quality Inspection Agent
Manufacturing Operations
- AGT-0337
Plant Digital Twin Agent
Manufacturing Operations
- AGT-0222
Incident Triage Agent
IT Operations
- AGT-0223
Root Cause Analysis Agent
IT Operations
- AGT-0224
Change Risk Assessment Agent
IT Operations
More in Niyojan